• Witnessing the demonstration of the controls system software, sortation, and maintenance diagnostic software and hardware at the Factory Acceptance Test (FAT) and making recommendations
  • Coordinating and assisting with TSA’s Site Acceptance Test (SAT) for security screening equipment
  • Assisting the BHS OEM in testing the system’s functions for proper operations
  • Conducting/observing the following BHS OEM tests to determine component/system readiness for next phase of testing:
      • Static Testing
      • Dynamic Testing
      • Functional Testing
  • Certifying that the BHS/EDS system is ready for TSA Pre-ISAT testing and commissioning
  • Assisting with the scheduling and coordination of TSA’s contractors observation of the system and subsequent Test Readiness Review (TRR)
  • Coordinating/Assisting and observing TSA’s contractor during integrate Site Acceptance Testing (iSAT) which involves line testing and system testing to determine if system meets both operational and security standards
  • Providing on-site leadership and support for system testing & commissioning
  • Coordinating BHS commissioning activities
  • Retro-commissioning of systems previously installed and commissioned by others to verify documentation, functionality, and effectiveness of installed systems
Back To Services